Skip to main content

Grafika Sentosa Mandiri

The Master-Slave Bar Installation

HEIDELBERG SpeedMaster 52, 72, 74, 102, M & S Series 
KOMORI Lithrone 40, 44 & 50
MAN-ROLAND 600 & 800 Series
MIEHLE 38, 40, 60, 61, 77

  • Clean the lead reel of all foreign material.
  • Insert the master bar (back edge first) onto the reel rod and press the front edge under the two reel rod clips.
  • Inch the cylinder round and repeat the operation with the trailing reel rod.
  • Inch the cylinder round to the leading reel rod to present it in the position to mount the blanket.
  • Rotate the leading reel rod to position the master bar parallel to the platform.
  • Insert the packing sheets over the lead cylinder bevel and insert the lead slave bar of the blanket (and under blanket if fitted) into the master bar.
  • Rotate the master bar on the reel rod through approximately 90 degrees into the cylinder to positively locate the slave bar onto the master bar.
    • Note: when installing the 800 series master bars due to the wide cylinder width, copper safety clips should be fitted initially and removed when installation is completed.
  • Inch the cylinder round to present the trailing reel rod and master bar.
  • Rotate the reel rod to position the trailing master bar vertically to the platform (pointing downwards) and insert the trail slave bar into the master bar.
  • Rotate the reel rod to tighten the blanket (and underblanket if fitted) employing the minimum amount of tension necessary to achieve optimum print quality.
This entry was posted in GSM and tagged .
error: Content is protected !!